Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 84042 REL 1: 2000-039-01 EXP WDFW WALLA WALLA RIVER BASIN M
Project Number:
Title:
WDFW Walla Walla River Basin Monitoring and Evaluation
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Walla Walla 100.00%
Contract Number:
84042 REL 1
Contract Title:
2000-039-01 EXP WDFW WALLA WALLA RIVER BASIN M
Contract Continuation:
Previous: Next:
74314 REL 129: 2000-039-01 EXP WDFW WALLA WALLA RIVER BASIN M
  • 84042 REL 30: 2000-039-01 EXP WDFW WALLA WALLA RIVER BASIN M
Contract Status:
Closed
Contract Description:
The Walla Walla River Basin Monitoring and Evaluation Project (WWM & E) is funded by Bonneville Power Administration (BPA, project No. 2000-039-01) under the general fund. The purpose of this project is to conduct natural production, tributary habitat, and hatchery research, monitoring and evaluation. Our goal is to provide ecological information and technical services to decision makers in support of adaptive management for restoration, conservation, and preservation of cultural, social, and economic salmonid resources. We plan to do this by collecting Viable Salmonid Population (VSP) criteria including estimates of abundance, productivity, survival rates, and distribution of reintroduced spring Chinook (Oncorhynchus tshawytscha) salmon, ESA-listed summer steelhead (O. mykiss), and bull trout (Salvelinus confluentus). Project results, including juvenile abundance, adult abundance, smolt-to-adult return, recruit per spawner, etc. are used to help inform and adapt salmonid management and recovery goals.

Project Work elements include Adult Enumeration, Spawning Surveys, Out-migrant monitoring, PIT-tagging, and Fish Salvage. We believe these monitoring and evaluation actions meet the highest priorities for fish population monitoring as identified by the Walla Walla Subbasin Plan and Snake River Salmon Recovery Plan. The work location is the Walla Walla River Basin and tributaries (e.g. Touchet River, South Fork, and Mill Creek). Project methods were adapted from the Salmonid Field Protocols Handbook: Techniques for Assessing Status and Trends in Salmonid and Trout Populations (http://www.stateofthesalmon.org/fieldprotocols/). A major focus of ours is to estimate “adults in” and “juveniles out” as a measure of salmonid population viability; for example, adult salmonids entering the basin to spawn are enumerated using weirs and video, spawning fish and carcasses are enumerated by multiple pass ground surveys, while the juvenile emigrant population is estimated using rotary screw traps and PIT-tags.

In 2019 WDFW regained an independent project number, 200003901 in order to define separation of Accord/non-Accord funded projects after the 2018 Accords Extension. Currently WDFW is to provide distinct project proposal, budget, statements of work and annual report.
From 2007 until 2019 CTUIR and WDFW project partners collaborated under project number 200003900 on the project proposal, budget, statements of work and annual report; but retained their individual contracts with BPA. CTUIR project offices are located at the William A. Grant Water and Science Center at Walla Walla Community College; while the WDFW South East Washington District Offices are located in Dayton, Washington.
Previously, CTUIR and WDFW conducted separate studies and reported to BPA in separate annual reports, under project numbers 199802000 and 20003900. Previous project reports, data and metadata are found at the CTUIR website www.data.umatilla.nsn.us/fisheries/index.aspx, or WDFW website at www.wdfw.wa.gov, or the BPA website (efw.bpa.gov).
Account Type(s):
Expense
Contract Start Date:
04/01/2022
Contract End Date:
03/31/2023
Current Contract Value:
$233,397
Expenditures:
$233,397

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Complete All EC Requirements A: 165. Environmental Compliance 03/31/2023 03/31/2023
Effective implementation management and timely contract administration B: 119. Manage & Administer Touchet River VSP Monitoring and Evaluation Project 03/31/2023 03/31/2023
Produce accessible, error-checked datasets C: 157. Adult enumeration 03/31/2023 03/31/2023
Produce accessible, error-checked datasets D: 157. Outmigrant monitoring for population estimates, survival, and migration characteristics 03/31/2023 03/31/2023
PIT Tag captured Juvenile Chinook and report captures and tags accordingly E: 158. PIT tag Chinook 03/31/2023 03/31/2023
PIT Tag captured steelhead and ensure proper capture and tagging reporting is completed. F: 158. PIT tag steelhead 03/31/2023 03/31/2023
Deliverable: An accessible, error-checked data set with metadata G: 162. Analyze data: Touchet River VSP Monitoring and Evaluation Project 03/31/2023 03/31/2023
Produce accessible, error-checked datasets H: 157. PIT Tag Array Operation and Maintenance 03/31/2023 03/31/2023
Completed Annual Report I: 132. RME DRAFT annual technical progress report for CY 2022 (1-1-22 - 12-31-22) 03/31/2023 03/31/2023

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 158 Mark/Tag Animals
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance
B 119 Manage & Administer Touchet River VSP Monitoring and Evaluation Project
C 157 Adult enumeration 01/31/2022
D 157 Outmigrant monitoring for population estimates, survival, and migration characteristics 01/31/2022
E 158 PIT tag Chinook 01/31/2022
F 158 PIT tag steelhead 01/31/2022
G 162 Analyze data: Touchet River VSP Monitoring and Evaluation Project
H 157 PIT Tag Array Operation and Maintenance 01/31/2022
I 132 RME DRAFT annual technical progress report for CY 2022 (1-1-22 - 12-31-22)
J 185 Periodic Status Reports for BPA